Laserfiche WebLink
<br /> IZiF <br /> 1.4,11 Make necessary modifications to contract documents after meeting with CM and <br /> CITY and submit five copies to the CM for distribution to TWDB and CITY, <br /> 1.4,12 Revise contract documents as necessary after receipt of TWDB review comments <br /> and resubmit, if necessary, <br /> Value Enaineering <br /> <br /> - 1.4,13 Participate in a two step value engineering process with a value engineering team <br /> selected and separately retained by the CITY. <br /> 1.4,14 Submit design memorandum and cost information for use by the value engineering <br /> team, Meet with the team to present design memorandum, obtain recommendations of <br /> the team and discuss the team's response. <br /> 1.4,15 Submit 60 percent complete construction contract documents and cost information <br /> to the value engineering team, Meet with the value engineering team to present the <br /> contract documents, obtain recommendations from the team, and discuss the Design <br /> Team's response, <br /> Preaward Services <br /> . <br /> 1.4,16 Assist the CM in providing the CITY with reproducible construction and procurement <br /> documents for bidding purposes, <br /> 1.4,17 Assist the CITY and CM during pre-bid conferences on the construction and the <br /> procurem ent contracts and answer questions of prospective or potential bidders and <br /> CITY's staff with regard to the design of the Project, make all necessary clarifications and <br /> interpretations of the construction and procurement contract documents and provide <br /> technical information to CM for addenda, <br /> 1.4,18 Assist the CITY and CM during the bid openings and answer questions as <br /> appropriate. <br /> 1.4,19 Have no authority to issue a Notice to Proceed to any Contractor, <br /> 1.5 BASIC SERVICES PHASE 4 - CONSTRUCTION PHASE SERVICES <br /> Project Administration <br /> <br /> 1,5,1 The Construction Phase of the Project will commence with the award of the <br /> construction contract and will terminate when the Project is accepted by the CITY, <br /> 1,5.2 Assist the CM in the administration of the construction contract as set forth in this <br /> Agreement and in the construction contract documents, ENGINEER will not pursue a <br />