Laserfiche WebLink
<br /> 'J"f <br /> Prepare and deliver a preliminary draft copy of the manual to the City and <br /> each Design Consultant prior to the Project Management Workshop. <br /> Incorporate workshop comments as appropriate into the final draft document. <br /> Distribute the final draft to the City and Design Consultants for review <br /> prior to the Pre-design workshop. Incorporate comments from that workshop <br /> into the final manual. Update the document as required by changes during <br /> the course of the Program. <br /> >'- <br /> De Zi ve rab les: 25 copies of the manual for each of the fa l lowing: <br /> Pre l iminary draft, final draft and final manuals. Manuals are to be <br /> enclosed in three ring binder. <br /> 1.04 Design Standards Manual <br /> Develop a design standards manual for use by all Design Consultants that <br /> describes the following: <br /> . Word processing software and formats. <br /> . Format for technical design memoranda and design reports. <br /> . Standard format for construction specifications. <br /> . Standards for Division 0 and Division 1 contract documents. <br /> . Drafting standards for software used and drawing production. <br /> . City preferences for materials and equipment. <br /> . City preferences for standard details and finishes Tor construction. <br /> . Addenda format. <br /> . Format for Change Order technical data. <br /> . Format for Operations and Maintenance manuals. <br /> Prepare and deliver a preliminary draft copy of the manual to the City and <br /> each Design Consultant p ri 0 r to the Program Management Workshop. <br /> Incorporate workshop comments as appropriate into the final draft document. <br /> Distribute the final draft to the City and Design Consultants for review <br /> prior to the Pre-design workshop. Incorporate comments from that workshop <br /> into the final manual. Update the document as required by changes during <br /> the course of the Program. <br /> De l i verab les: 25 copies of the manual for each of the fa II owing: <br /> Pre l iminary draft, final draft and final manuals. Manuals are to be <br /> enclosed in three ring binders. <br /> 1.05 Management Information System <br /> Develop a Management Information System and coordinate information <br /> management and distribution for the construction projects. The Management <br /> Information System is to: <br /> R:\CSBD\SMIIC.DDC <br /> Exhi bit B - 4 <br />