My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1995-223
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1995
>
Res 1995-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2007 8:26:09 AM
Creation date
6/28/2007 8:26:09 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1995-223
Date
12/11/1995
Volume Book
121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> , <br /> 130X <br /> 4.00 DESIGN PHASE REVIEW SERVICES <br /> 4.01 Value Engineering Studies <br /> Provide Value Engi neeri ng reviews at the 1 eve 1 appropriate for the <br /> wastewater treatment plant upgrade/expansion project at the 20% and 60% <br /> design milestones to identify and quantify potential cost savings to reduce <br /> the overall cost for the '- facil i ti es. Conduct an i nforma 1 workshop to <br /> identify potential changes which could reduce the cost of ,the facilities or <br /> increase the value of the facilities by more than the cost of the changes. <br /> Present selected alternatives for more detailed evaluation. The detailed <br /> evaluation will consider cost, ability to implement the changes, technical <br /> analysis and the impact of changes on the overall project. Ideas which <br /> pass the technical and economic analysis, and merit incorporation into the <br /> design of the project will be presented as a proposal to the designer and <br /> the City for consideration in a draft report. The Design Consultants. <br /> response will be included in the final report. <br /> Deliverables include a draft' and final value engineering recommendation <br /> report. <br /> 4.02 Constructability Reviews <br /> Review construction contract documents for each construction project at the <br /> preliminary report milestone and the 95% design milestone for <br /> constructability, abil ity to operate and maintain facil iti es after <br /> construction, ability of the existing facilities to remain in operation <br /> during construction and the coordination of construction details. <br /> a. Prel iminary report review. Review the prel iminary design report <br /> prepared by the Design Consultant for each construction project, which <br /> is to include locations of the faci 1 iti es, prel iminary equipment <br /> selections, and rough layout of equipment. The revi ew wi 11 provide <br /> suggestions to improve the ability to: <br /> 1. Operate and maintain proposed equipment and the completed facility. <br /> 2. Assess construction impact on integrity of existing facilities. <br /> 3. Assess impact on the abi 1 ity to keep the current facilities in <br /> operation. <br /> 4. Determine need to pre-purchase or pre-select equipment. <br /> 5. Allocate risk for construction. <br /> 6. Assess impacts on anticipated future facilities as identified in the <br /> documents. <br /> Prepare a report on observations made with recommendations for <br /> improvements where appropriate. <br /> R:\CS80\SMIIC,OOC <br /> Exhi bit B - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.