Laserfiche WebLink
<br /> C. Floor Plan and Room Finish Schedule <br /> D. Door and Window Drawings and Schedules <br /> E. Exterior Elevations <br /> F. Interior Elevations, as required <br /> G. Construction Details, Cabinet Drawings <br /> H. Engineered Structural Foundation and Framing <br /> I. Engineered Mechanical Drawings <br /> J. Engineered Electrical Drawings <br /> 4. Specifications <br /> Based on the Design and Construction Documents and any further <br /> ~djustments in the scope or quality of the Project or in the Project <br /> mdget authorized by the OWNER, the ARCHITECT shall prepare the plans <br /> md technical specifications, subject to review and approval by the <br /> OWNER. <br /> 1.5 BIDDING PHASE ARCHITECT shall assume the responsibility for the <br /> printing of drawings and specifications and the distribution of <br /> construction contract documents to prospective bidders and to area plan <br /> rooms. ARCHITECT shall answer all questions of prospective or <br /> potential bidders and OWNER's staff, make all necessary clarifications <br /> and interpretations of the construction contract documents, and be <br /> responsible for the issuance of addenda (if any). ARCHITECT shall <br /> conduct the bid opening and manage all project related paperwork <br /> between the bid opening and the beginning of construction. The OWNER <br /> reserves the right to issue a Notice To Proceed to the contractor. <br /> 1.6 CONSTRUCTION PHASE--ADHINISTRATION OF THE CONSTRUCTION CONTRACT <br /> The Construction Phase will commence with the award of the Contract for <br /> Construction by the OWNER and will terminate when the Project has been <br /> accepted by the OWNER. <br /> 1.7 The ARCHITECT shall be responsible for the observation of <br /> construction at periodic intervals, with written reports to Owner; <br /> review and approval of shop drawings and submittals, review and <br /> authorization of the contractor's monthly applications for payment, <br /> :idministration of any change orders required, final inspections, and <br /> )ne year warranty inspection. <br /> 1.8 TTIm The ARCHITECT shall submit to the OWNER within sixty (60) <br /> days of the effective date of this contract, the final drawings and <br /> specifications as reviewed and finally approved by the OWNER. <br /> ARTICLE 2 <br /> THE OWNER'S RESPONSIBILITIES <br /> 2.1 The OWNER shall provide access to and make all necessary <br /> provisions for the ARCHITECT to enter upon public and private property <br /> as required for the ARCHITECT to perform services under this Agreement. <br /> -2- <br />