My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-130
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2007 4:27:53 PM
Creation date
7/18/2007 1:40:17 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-130
Date
7/17/2007
Volume Book
172
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />or procedures, or for safety precautions and programs in connection with the work, for the acts or <br />omissions of the Contractor, subcontractors or any other persons performing any of the work, or <br />for the failure of any of them to carry out the work in accordance with the construction contract <br />documents unless such acts or omissions are due to the negligence of the Engineer or are acts or <br />omissions under the Engineer's control. However, Engineer will exercise its authority on behalf <br />of City in accordance herewith and particularly during the construction phase so that all work <br />performed by the Contractor results in a Project completed in accordance with the construction <br />contract documents, and during any phase should the Engineer become aware of the Contractor's <br />utilization of means, methods, techniques, sequences and/or procedures of construction which, in <br />Engineer's opinion, will not result in completion of the Project in accordance with the <br />construction contract documents; or which are unsafe, Engineer will immediately inform the City <br />and will take all necessary action which the Engineer is authorized under this Agreement to take <br />to correct the matter. However, the Engineer is not responsible for health or safety precautions <br />of construction workers or the Contractor's compliance with the health and safety requirements <br />in the construction contract, or with federal, state, and local occupational safety and health laws <br />and regulations. <br /> <br />1.7.12 At all times have access to the work wherever it is in preparation or progress. <br /> <br />I. 7 .13 Determine the amounts owing to the Contractor (in coordination with the City's review <br />of requests for payment), based on its on-site professional inspections and on evaluations of the <br />Contractor's applications for payment including comparisons of Contractor's monthly cost <br />reports with its applications for payment, and will make recommendations for payment to the <br />City in these amounts, as provided in the construction contract documents, or take such other <br />appropriate action which the Engineer deems necessary. <br /> <br />I. 7 .14 Make recommendations for payment that constitute a representation by Engineer to the <br />City, based on the Engineer's on-site inspections as provided in subsection 1.7.8 and on the data <br />comprising the Contractor's application for payment, that the work has progressed to the point <br />indicated; that, to the best of the Engineer's knowledge, information and belief, the quality of <br />the work is in acceptable conformance with the construction contract documents (subject to an <br />evaluation of the work for conformance with the construction contract documents upon <br />substantial completion, subject to the results of any subsequent tests required by or performed <br />under the construction contract documents, subject to minor variations from the construction <br />contract documents correctable prior to completion, and subject to any specific qualifications <br />stated in the Certificate for Payment); and that the Contractor is entitled to payment in the <br />amount certified. However, the issuance of a Certificate for Payment will not be a representation <br />that the Engineer has made any examination to ascertain how and for what purpose the <br />Contractor has used the monies paid by the City. Substantial and Final Completion. <br /> <br />1.7.15 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Engineer's reasonable opinion, it is necessary or advisable for the <br />proper implementation of the intent of the construction contract documents, and with the <br />approval of the City, the Engineer will have authority to require special inspection or testing of <br /> <br />Davis Lane Wastewater Improvements Project - CH2M Hill <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.