My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-130
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2007 4:27:53 PM
Creation date
7/18/2007 1:40:17 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-130
Date
7/17/2007
Volume Book
172
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />clarifications as requested by contractor for the duration of the Project. The Engineer will log <br />and track the Contractor's requests. <br /> <br />I. 7 .19 Assist the City in reviewing and responding to the Contractor's requests for substitution <br />of materials and equipment and will advise the Owner as to the acceptability of such <br />substitutions. <br /> <br />1.7.20 Authorize minor variations/field instruction and prepare minor changes in the plans and <br />specification as directed by the City that do not involve an adjustment in the Contractor's <br />contract price nor time for construction and are not inconsistent with the intent of the <br />construction contract documents. <br /> <br />I <br /> <br />1.7.21 Receive and review the Contractor's response to a request for change and obtain such <br />further information as is necessary to evaluate the basis for the Contractor's proposal. The <br />Engineer will assist the City in its negotiations of the proposal and, upon approval by the City, <br />prepare necessary final change order documents in triplicate originals for approval by the City <br />and execution in accordance with the construction contract documents. In addition the Engineer <br />will review all Contractor requested changes to the contract for construction and will make <br />recommendations to the City regarding the acceptability of the Contractor's request and, upon <br />approval ofthe City assist the City in negotiation of the requested change(s). The Engineer will <br />also provide periodic reports to the Owner about the status of Change Orders. The report shall <br />include issued Change Orders, pending change orders, and change order amounts. The Engineer <br />will not issue change orders not previously approved in writing by City, and no course of <br />conduct on the part of Engineer or City will amend, waive or alter this provision. <br /> <br />1.7.22 Review information submitted by the Contractor regarding the effect of proposed or <br />issued Change Orders upon the construction schedule, duration and completion date and will <br />advise the City as to the potential impact of proposed or issued Change Orders. The Engineer <br />will assist the City in discussions with the Contractor concerning the potential impact of <br />proposed or issued Change Orders. <br /> <br />I. 7 .23 Conduct professional inspections to determine the dates of substantial completion and <br />final completion for the Project, to evaluate the work for acceptable conformance with the <br />construction contract documents and in light of any subsequent tests performed as described in <br />Subsection 1.7.14 to verify that any minor deviations from the construction contract documents <br />as described in Subsection 17.14 have been corrected and that the reasons for any specific <br />qualifications in any and all previous certificates for payment as described in Subsection 1.714 <br />hereof are either no longer valid or the condition(s) and/or problem(s) have been corrected; <br />receive and review written warranties and related documents required by the construction <br />contract documents and assembled by the Contractor. The Engineer will issue final certificates <br />for payment or take other appropriate action; and will make a written recommendation to the <br />City regarding City's acceptance of the Project based upon the results of the final inspection. <br /> <br />I <br /> <br />Davis Lane Wastewater Improvements Project - CH2M Hill <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.