Laserfiche WebLink
<br />Identification of probable secondary expenditure multipliers for estimating indirect impacts will be made. <br />The result of this effort will be a twenty-year economic projection subdivided into five-year increments based <br />upon the airport and land use improvement programs detailed in Element 5.0 -FaciHty Requirements. This <br />analysis will identify the airport's role as: <br />1. An attractor to potential new business, industry and air service. <br />2. The airport's current and anticipated (future) contribution to the area economy. <br />3. Its secondary role as it affects aspects as a stimulus to recreation tourism, quality of life, etc. <br />A pro-forma analysis and financial plan of the airport operations as a public owned and operated facility <br />will be produced and an analysis will be performed. The analysis will include potential employment on the <br />airport and in related businesses. <br />The financial plan will include an estimate of capital investment along with a schedule of improvements <br />identified in Element 3.0. The development schedules will be based upon the short, Intermediate, and long <br />term needs as developed In the study, and will be based upon the role assessment and development plans <br />resulting from Elements 3.0 and 5.0. <br />There will be an analysis of possible funding sources including general obligation bonds, revenue bonds, <br />federal funding sources and the possible infusion of private funding for certain airport improvements. <br />Existing airport management policies and practices (as they affect airport revenues) will be reviewed and <br />considered in the context of anticipated future airport needs and public ownership, and a review of airport <br />rates, charges and leases will be conducted. <br />TASK 14.0. FINANCING <br />There will be an analysis of possible funding sources including general obligation bonds, revenue bonds, <br />federal funding sources, and the possible infusion of private funding for certain airport improvements. <br />Financing options and recommendations will be provided in the proposed phase development of the San <br />Marcos Municipal Airport. <br />PHASE IV . MASTER PLAN DOCUMENTS <br />Task 15.0 will be accomplished in large measure as the study develops. Each task described in this <br />proposal will have, as its output, documentation consisting of technical memoranda, working papers, <br />graphics or other appropriate material consistent with the City requirements. A survey of study documents <br />to be delivered Is shown in Section 4.0 of this proposal. <br />TASK 15.0. DRAFT MASTER PLAN UPDATE <br />At the completion of the study, a final draft report will be prepared that will be primarily based upon the <br />technical memoranda/working papers previously submitted. The report will be submitted to the City for <br />review and comment, as indicated on the proposed project schedule. Following subsequent review and <br />comment by the City, the TDA, the FAA and other officials or parties, a final report will be prepared, along <br />with an executive summary which will present the study results and recommendations in a brief format <br />intended primarily for public distribution. <br />