My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1991-131
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1991
>
Res 1991-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2007 10:03:07 AM
Creation date
7/20/2007 10:03:07 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
Number
1991-131
Date
10/28/1991
Volume Book
104
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> A. INTRODUCTION <br /> Growth along the 1-35 corridor between Austin and San Antonio <br /> continues to impact the natural resources of the region. One of the <br /> most notable is the Edwards Aquifer which provides most of the water <br /> needs in the Region. The aquifers' susceptability to depletion is of <br /> concern as water demands increase. The need to reduce dependence on <br /> the Aquifer is becoming acute and resulting in major projects by San <br /> Antonio and others to reduce their dependence on the Aquifer. <br /> Additionally, plans are underway to limi t future pumping from the <br /> Edwards Aquifer by granting permits to establish the allowable <br /> withdrawals. It is possible that in the near future the <br /> municipali ties that use wells will be 11mi ted to some maximum <br /> withdrawal rate based upon historical usage, but less than that <br /> required to meet future growth needs. <br /> The need to develop alternate water supply sources is necessary <br /> and some muncipali ties have already begun looking at ways to <br /> transition to new sources. New Braunfels is actively pursuing the use <br /> of surface water from the Guadalupe River and a water treatment plant <br /> to reach this goal. They included in their planning the possibility <br /> of San Marcos entering into a partnership to receive a portion of the <br /> treated water. <br /> The purpose of this report was to review the cost estimate for the <br /> San Marcos portion of the New Braunfels project and propose alternate <br /> approaches and opinions of probable project cost for San Marcos to <br /> develop a surface water supply independent of the New Braunfels <br /> project. <br /> B. PREVIOUS STUDIES <br /> 1. The Guadalupe-Blanco River Authority (GBRA) provides directly <br /> or indirectly, a large portion of the water used in the region <br /> between, but not including Austin and San Antonio. They are closely <br /> involved with and concerned about the conservation of water resources <br /> and realize the importance of water to the future of the region, <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.