Laserfiche WebLink
<br /> H APPENDIX F-DRAINAGE, EROSION CONTROL ~4 <br /> (2) Does not have slopes of over fifteen (15) per cent and is on a <br /> tract of less than two (2) acres. <br /> (b) Construction sequencing and erosion controls. <br /> (1) A comprehensive and detailed stormwater runoff, erosion <br /> and sedimentation control plan and report shall be sub- <br /> mitted. The report shall specify installation [and] mainte- <br /> nance of controls. All items noted in the erosion control <br /> and construction sequencing plans shall also be included <br /> in the final construction plans. <br /> Supp. No. 21 <br /> 1216.1 <br />