Laserfiche WebLink
<br /> 203 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 15 <br /> HIKE AND BIKE TRAIL <br /> 15-08 CLEANUP: <br /> a. After the work required has been accomplished the work <br /> areas shall be thoroughly cleaned of all debris, chunks, forms, <br /> stakes, and left in a neat and finished condition. <br /> 15-09 MEASUREMENT AND PAYMENT: <br /> a. HIKE AND BIKE TRAIL shall be measured by the lineal foot <br /> of 8' wide cross section. <br /> b. Sub-base work shall not be measured as a separate item, <br /> but shall be considered subsidiary work pertaining to the Hike and <br /> Bike Trail Bid Item. <br /> c. Base work shall not be measured as a separate item, but <br /> -shall be considered subsidiary work pertaining to the Hike and Bike <br /> Trail Bid Item. <br /> d. MATCHING concrete sidewalks and all items required for <br /> complying with the specifications and plans but not herein <br /> enumerated shall not be measured for separate payment but shall be <br /> considered subsidiary work pertaining to the contract item. <br /> e. HIKE AND BIKE TRAIL acc.ptably completed, and measured as <br /> provided above, will be paid for at the contract unit price per <br /> lineal foot bid for HIKE AND BIKE TRAILS (8' wide) which price <br /> shall be full compensation for furnishing all materials, and for <br /> all equipment, tools, labor, and incidëntals necessary to complete <br /> the work. <br /> 15-3 <br />