My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 207 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 16 <br /> PEDESTRIAN BRIDGE <br /> b. The Contractor is hereby advised that the OWner is only <br /> able to provide legal access to the west abutment of the Pedestrian <br /> Bridge over Purgatory Creek, (shown on Sheet 12 of the drawings) <br /> through the Union Pacific Railroad Right-of-way with a temporary <br /> work easement. The Contractor shall exercise due care to use <br /> easement for access of equipment, vehicles, and delivery of <br /> materials only. The Contractor is not allowed to park vehicles, <br /> equipment, or store materials in said work easement. <br /> 16-06 MEASUREKENT AND PAYMENT: <br /> a. PEDESTRIAN BRIDGE OVER PURGATORY CREEK will be measured <br /> for payment as a complete unit as shown on the drawings. No <br /> separate measurement shall be made for excavation, forming, <br /> dewatering, reinforced concrete abutments, structural steel, wood <br /> decking, fasteners, but all such items shall be considered <br /> subsidiary work pertaining to the item bid. <br /> b. PEDESTRIAN BRIDGE OVER SAN MARCOS RIVER will be measured <br /> for payment as a complete unit as shown on the drawings. No <br /> separate measurement shall be made for excavation, forming, <br /> dewatering, reinforced concrete abutments, structural steel, wood <br /> decking, fasteners, but all such items shall be considered <br /> subsidiary work pertaining to the item bid. <br /> c. Drilled Shaft foundation work shall be measured for <br /> payment under Specification 7. <br /> d. PEDESTRIAN BRIDGE OVER PURGA'l'ORY CREEK acceptably <br /> completed and measured as provided above will be paid for at the <br /> contract unit price bid for PEDESTRIAN BRIDe! OVER PURGATORY CREEK, <br /> which price will be full compensation for furnishing all materials, <br /> and for all equipment, tools, labor and incidentals necessary to <br /> complete the work. <br /> e. PEDESTRIAH BRIDGE OVER SAN MARCOS RIVER acceptably <br /> completed and measured as provided above will be paid for at the <br /> contract unit price bid for PEDESTRIAN BRIDGE OVER SAN MARCOS <br /> RIVER, which price will be full compensation for furnishing all <br /> materials, and for all equipment, tools, labor and incidentals <br /> necessary to complete the work. <br /> 16-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.