My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 89 <br /> RAMON, LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATIONS lB <br /> SITE PREPARATION <br /> 1B-OS CLEANUP: <br /> a. Structures in the work area shall be disposed of as <br /> indicated on the plans; however, any structures not shown, e.g., <br /> old building foundations, slabs, macadam roads, wire fences, wells, <br /> rocks larger in diameter than 3 inches, etc., shall be removed. <br /> 1B-06 EQUIPMENT: <br /> a. Equipment necessary for the efficient and expeditious <br /> accomplishment of the required work shall be on hand in good <br /> condition before the work is started. <br /> 1B-07 MEASUREMENT AND PAYMENT: <br /> a. LAYOUT acceptably completed as provided above will be paid <br /> for at the contract lump sum price per complete bid for LAYOUT, <br /> which price shall be full compensation for all layout and for all <br /> equipment, tools, labor, and incidentals necessary to complete the <br /> work. <br /> b. Partial payments of the "Lump Sum" bid for LAYOUT shall be <br /> made as the work proceeds, after presentation of invoices by the <br /> Contractor showing his surveying costs and evidence of the charges <br /> of suppliers and of subcontractors for the survey work performed <br /> by them. <br /> If the total of such payments is less than the contract "Lump <br /> Sum" bid for LAYOUT, the unpaid balance will be included in the <br /> final contract payment. Total payment will. be the "Lump Sum" bid <br /> for LAYOUT, regardless of actual cost to the Contractor. <br /> Partial payment will not be made under this item for the <br /> purchase cost of materials and equipment having a residual value. <br /> c. SITE PREPARATION acceptably completed as provided above <br /> will be paid for at the contract lump sum price bid for SITE <br /> PREPARATION, which price shall be full compensation for all <br /> equipment, tools, labor, and incidentals necessary to complete the <br /> work. <br /> 1B-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.