My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 97 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 3 <br /> EXCAVATION FOR STRUCTURES <br /> e. Backfill of structures, other than pipe, shall be made with <br /> reasonable uniformity around and along the structure. It shall be <br /> placed in 6 inch layers, compacted thickness. <br /> f. Backfill of the pipe shall be in accordance with <br /> requirements of the sections specifying the particular use of the <br /> pipe. <br /> 3-08 MEASUREMENT AND PAYMENT J <br /> a. Structural Excavation will not be measured for separate <br /> payment but shall be considered subsidiary work pertaining to the <br /> involved items of the contract. <br /> b. Backfill (providing material, placing or compacting) for <br /> structures will not be measured for separate payment but shall be <br /> considered subsidiary work pertaining to the involved items of the <br /> contract. <br /> c. Laboratory testing to determine the Optimum Density (AASHTO <br /> Proctor) for the backfill material proposed by Contractor will not <br /> be measured for separate payment but shall be considered subsidiary <br /> work pertaining to the involved items of the contract. Each <br /> substantially different backfill material proposed for use by the <br /> Contractor will require its own laboratory determined Proctor <br /> curve. <br /> 3-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.