<br /> 117 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 7 <br /> DRILLED SHAFT FOUNDATIONS <br /> 7-04 CONSTRUCTION METHODS: <br /> a. The Contractor shall perform the excavation required for <br /> the shafts through whatever materials encountered, to the <br /> dimensions and elevations indicated or required by the site <br /> conditions. The shaft shall be placed within a tolerance of 1 inch <br /> per 10 feet of depth. <br /> b. The drawings indicate the expected depths and elevations <br /> where satisfactory bearing material will be encountered. This <br /> information is used as a basis for the contract. If satisfactory <br /> material is not encountered at plan elevation, the footing may be <br /> raised or lowered as determined by the Engineer. <br /> c. Temporary steel casing of ample strength to withstand <br /> handling stresses, the pressure of concrete and the surrounding <br /> earth or backfill materials, and watertight will be required for <br /> the entire length of shaft to seal groundwater from the bearing <br /> stratum and to prevent caving of overburden soils into the shafts. <br /> d. The elevation of the top of shaft will be located below <br /> ground level at the time of concrete placement. An oversize casing <br /> from 1 foot above ground elevation to 1 inch below the top of shaft <br /> will be required to control caving of any material into the freshly <br /> placed concrete. <br /> e. The drilled shaft con8truction is next to the San Marcos <br /> River, which is a protected watershed. The Contractor shall be <br /> responsible for the protection of the entire construction area, <br /> such that there is NO silt, sedimentation, or water pollution <br /> generated by the construction of the drilled shaft and subsequent <br /> construction on the bridge. THE CONTRACTOR IS HERESY PLACED ON <br /> NOTICE THA'1' 'l'HB POLLU'l'ION OF THE SAN HARCOS RIVER BY SILT, <br /> SEDIKEN'l'ATION, OR ANY 0'l'HE R WATER POLLUTION COULD CAUSE THE <br /> OPERATION TO BE SHUT DOWN. If the construction is shut down <br /> because of the Contractor's inability to control water pollution <br /> at this site (or any other site), the Contractor shall not be <br /> entitled to additional compensation, and could be penalized by the <br /> liquidated damages if inability to resolve the problems causes the <br /> time of construction to extend past the contract time. <br /> 7-2 <br />