Laserfiche WebLink
<br /> 119 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 7 <br /> DRILLED SHAFT FOUNDATIONS <br /> b. Structural excavation, site preparation, drilled shaft, <br /> dewatering, casing, temporary erosion and pollution control, <br /> reinforcing steel, concrete and its placement, etc., shall NOT be <br /> measured for separate payment, but shall be considered subsidiary <br /> work pertaining to the Drilled Shaft Pilings item bid. <br /> c. DRILLED SHAFT PILING acceptably completed and measured as <br /> provided above, shall each be paid for at the contract unit price <br /> bid DRILLED SHAFT PILING (actual dimensions to the nearest 0.1 <br /> foot), which price shall be full compensation for furnishing all <br /> materials, and for all equipment, tools, labor, and incidentals <br /> necessary to complete the work. <br /> 7-4 <br />