My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 126 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 8 <br /> GROUP SHELTER <br /> (2) Schedule of Painting: <br /> (a) Iron and steel (non-galvanized) <br /> One coat: Enamel undercoat <br /> Two coats: Semi-gloss or satin enamel <br /> (Omit undercoat if shop applied - touch <br /> up as necessary.) <br /> (b) Iron and steel (galvanized) <br /> Treat as specified, one coat galvanized <br /> metal primer, two coats semi-gloss or <br /> satin enamel. <br /> (c) Exterior and interior wood <br /> Two coats of exterior latex paint equal <br /> to Pratt & Lambert's Solid Hide Rustic <br /> Stain/Finish. <br /> 8-08 ELECTRICAL: <br /> a. General: The accompanying plans and specifications cover <br /> the furnishing of all labor, materials, tools, transportation <br /> services, etc., necessary for complete installation of electrical <br /> facilities. The work includes, but is not limited to the following <br /> items: <br /> (1) A complete system of wiring in rigid conduit from <br /> trench grade to ceiling height, and metallic conduit (or) at <br /> ceiling height for all power with all necessary switches, <br /> panelboards, junction boxes, outlets, lights, wiring devices, and <br /> other items necessary for a complete installation, as shown on the <br /> drawings and necessary for a complete and usable facility. <br /> (2) 'lhe Contractor shall pay all fees and obtain all <br /> permits as required in connection with his work. <br /> (3) At the finish of the work, this contractor shall <br /> furnish the owner a certificate showing the acceptance of the work <br /> done under his contract by the local inspector and payment of <br /> inspection fees. <br /> b. Codes: The 1987 National Electrical Code, the 1988 and <br /> 1989 supplements thereto shall be recognized as a minimum <br /> acceptable standard for work under these specifications, see <br /> 8-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.