My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1989-035
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1989
>
Res 1989-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2007 3:33:24 PM
Creation date
8/2/2007 3:33:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1989-35
Date
4/24/1989
Volume Book
94
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> TIWC <br />The soil that was excavated from around the leaking lines and the <br />cuttings removed during drilling have been placed on plastic in the <br />maintenance yard. This area is secure within a barbed wire 6 foot <br />security fence and is shown in figure 1. The contaminated dirt has been <br />placed on 6 mil plastic. Initially, an earthen dike was constructed to <br />prevent surface runon & runoff. This dike has been upgraded by placing <br />an 8 inch pipe barrier underneath the perimeter of the plastic. The <br />plastic edge has been secured by the placement of clean fill dirt. <br />5.0 SITE MAP <br />~ site map has been prepared, see Figure 1. The original location of <br />the four underground storage tanks is indicated. The exact orientation <br />of the two small diesel tanks (1 & 2) is not known. Tank 3 is a regular <br />gasoline tank. Tank 4 is an unleaded gasoline tank. The lines 3 & 4 <br />containing the leaks are shown. <br />The bore holes are indicated on the site map with circles. <br />Concrete covers the area immediately over where the dispensers and tank <br />3 are. Asphalt covers the area around the building and the driveway to <br />the west storage area. There is a truck wash where the drilling augers <br />are washed between each boring. <br />6.0 INITIAL SITE INVESTIGATION <br />The soil beneath each of the leaks was initially excavated to 2-3 feet. <br />Samples of the/walls and along the bottom of the excavation revealed <br />gasoline contamination beneath each line. Additional excavation with an <br />extend-a-hoe to a depth of 12 feet was performed along the length of <br />each hole. Readings were made with a portable combustion gas detector. <br />with two exceptions, all readings were explosive, i.e. >1.4% gasoline, <br />in the soil interstitial spaces. These two samples were at twelve feet <br />below leak 3 in line 4 and at 4/8" under leak 1 on line 4. <br />Soil samples were taken with a trowel from the side walls and from the <br />soil in the backhoe bucket and immediately placed in glass samples and <br />placed with ice in an ice chest for offsite analysis. <br />7.0 DRILLING <br />Drilling was performed by Bell & Son Drilling and Texas Industrial Waste <br />Control. Drilling and installation of monitoring wells, recovery wells <br />and injection wells is being performed under the supervision of Robert <br />Crouch, Water Well Driller license * 15. Groundwater was encountered at <br />a depth of approximately fifteen feet. Auger rigs are bein~ Q~Ad for <br />drilling. Eight hoies were augered on 3/17/89. The locati~ns ðre shown <br />on Figure 1. <br />, 18 '-"O8n Road . GeorGetown. Texas 18828 . ($12)259-226& . (512)2156-9924 <br />
The URL can be used to link to this page
Your browser does not support the video tag.